BASF secures renewable energy credits linked to Swift Current Energy’s Castle Gap Wind

(BASF) HOUSTON, TX, January 22, 2026 – BASF has signed a 15-year agreement with BP Energy Retail Company to acquire Renewable Energy Certificates (RECs). These certificates are linked to approximately 47 megawatts (MW) of annual capacity from Swift Current Energy’s Castle Gap Wind project in Central Texas. By securing RECs, BASF can offset carbon-intensive, grid-supplied electricity […]
Swift Current Energy Announces 197 MW Wind Project In Texas Is Now Operational

Goldman Sachs provided the tax equity for the project, which was developed and is owned and operated by Swift Current Energy BOSTON and HOUSTON, Nov. 13, 2023 – Swift Current Energy (“Swift Current”) today announced that its 197 MW Castle Gap Wind project (the “Project”) located in Central Texas is now operational and providing power […]
Swift Current Energy Finances 197 MW Texas Wind Project with MUFG, CaixaBank

North American Wind Power
Swift Current Energy Closes Project Financing on 197 MW Wind Project in Central Texas

Swift Current Energy
Swift Current Energy Secures 196 MW in Wind Turbine Supply from Nordex Group

Swift Current Energy
Swift Current Energy Orders 41 Wind Turbines from Nordex Group

North American Windpower